LOGISTICS

Fulfillment Distribution Center

Denver, CO

Requirement

Client required a controlled space, off the ground floor, with limited employee access for testing sortation technology.

RESULTS

Legacy coordinated design and installation of a 3K sq. ft. platform in an active distribution center in 10 weeks.

Manufacturing

American Manufacturing

Phoenix, Arizona

Requirement

Client was opening a state of the art manufacturing facility in AZ. Client needed 16 platforms, delivered in phases based on the facility build out, that would hold manufacturing equipment. In addition, the client was looking for a steel structure that would cover flammable items and would pass fire inspection.

Results

Legacy designed, delivered and installed 16 platforms (with 4 different designs) within 6-8 weeks at each time of order. An additional 25,000 sqft canopy structure was designed and installed for foam storage and passed fire inspection.

 

data centers

Steel Fabricator

Wisconsin

Requirement

Supporting Data Center Construction, the client required powder coat painting of large weldment racks to store data servers.

Results

Legacy built the capacity to support and execute on an additional 4,000,000 lbs of painted steel in an 18-month duration