LOGISTICS
Fulfillment Distribution Center
Denver, CO
Requirement
Client required a controlled space, off the ground floor, with limited employee access for testing sortation technology.
RESULTS
Legacy coordinated design and installation of a 3K sq. ft. platform in an active distribution center in 10 weeks.


Manufacturing
American Manufacturing
Phoenix, Arizona
Requirement
Client was opening a state of the art manufacturing facility in AZ. Client needed 16 platforms, delivered in phases based on the facility build out, that would hold manufacturing equipment. In addition, the client was looking for a steel structure that would cover flammable items and would pass fire inspection.
Results
Legacy designed, delivered and installed 16 platforms (with 4 different designs) within 6-8 weeks at each time of order. An additional 25,000 sqft canopy structure was designed and installed for foam storage and passed fire inspection.
data centers
Steel Fabricator
Wisconsin
Requirement
Supporting Data Center Construction, the client required powder coat painting of large weldment racks to store data servers.
Results
Legacy built the capacity to support and execute on an additional 4,000,000 lbs of painted steel in an 18-month duration